Contract Signing
Mr. Moinuddin Hasan Rashid, MD of United Group, Bangladesh and Mr. K V Kartha, MD of M.E Energy, India, signing the contract in May’14.
Manufacturing of Boiler’s at M.E Energy Works
Manufactured at World Class manufacturing facility of M.E Energy works, Pune, India
Transportation in sea worthy packing
Consignment of 52 containers with 20 nos of boilers and systems were safely delivered via sea route to Chittagong Port, Bangladesh with sea worthy packing.
Boiler System Installation at site
Under supervision of Engineers from M.E Energy the complete project was installed and commissioned during first week of May’15.
Plant commissioned in May’15 and synchronized with grid, delivering 16 MW of additional power to Bangladesh (BPDB)
- 13,500 hours of uninterrupted running as on Dec’18
- 128 Million per annum extra units generated
- USD 12.2 Million of additional revenue
- Carbon Emission Reduction : 60,000 Tons/ year
Other Combined Cycle Power Plants in Bangladesh under various stages of execution by M.E Energy:-
- 8 MW Secondary Power Plant on 113 MW CCPP of Confidence Group at Bogra Phase I
- 8 MW Secondary Power Plant on 113 MW CCPP of Confidence Group at Bogra Phase II
- 3.5 MW of Secondary Power Plant on 55 MW CCPP of Zodiac Power, Confidence Group at Chittagong
- 9 MW of Secondary Power Plant on 95 MW CCPP of Powerpac Muthiara at Jamalpur