Blog
“Combined Cycle Power Plants in Bangladesh”
20 nos of Waste Heat Recovery Boilers of 4.2 TPH each installed on the exhaust path of 20 nos Natural...
Cash Savings from Waste Heat Recovery on Sinter Plant
Modern steel plants generate huge profits from energy savings and sale of by-products or rather, the profitability of steel plants...
M.E Energy wins tender for IOCL’s Mathura Refinery for Waste Heat Recovery Boiler on Incinerator
Indian Oil Corporation Limited (IOCL), a Maharatna PSU, places turnkey order for Waste Heat Recovery Boiler (WHRB) on Incinerator on...
Pune based M.E Energy Secures Large Export Order for Waste Heat Based Power Plant
M.E Energy Pvt. Ltd., a Pune based thermal engineering company has bagged a large export order to design, manufacture and...
News & Events
Growing Globally: M.E Energy Adds South Korea & Qatar to Its Global installation locations.
M.E Energy proudly announces its successful expansion into two new global markets – South Korea and Qatar. MEE will design, manufacture and Supply a heating system with Hot Air as Heat Transfer Medium, working at 550 Deg C to a major fine chemicals manufacturing unit in South Korea. As for Qatar the system recently designed, […]
M.E Energy successfully commissions efficiency enhancement project for IOCL
M.E. Energy is proud to announce the successful supply, commissioning and performance guarantee trials of a solution to improve the overall efficiency of their 103 TPH HRSG supplied and installed by another engineering major two decades back. This strategic upgrade enhances system efficiency by around 2%, significantly reducing fuel consumption.
M E Energy recently designed, manufactured waste heat recovery boiler for IOCL.
M E Energy recently designed, manufactured waste heat recovery boiler for IOCL at the backend of Incinerator. The WHRB is being commissioned at Indian Oil Corporation Limited at their Acrylic Acid & Butyl Acrylate Unit.
M.E Energy successfully renews its ASME ‘U’, ‘R’, and ‘S’ stamp certification
M.E Energy, has received the prestigious U stamp certification for its Waste Heat Recovery Boiler (WHRB) designed for an oil refinery in Qatar. The U stamp certification, granted by the renowned American Society of Mechanical Engineers (ASME), validates the exceptional quality and safety standards adhered to by ME Energy Pvt Ltd. The WHRB technology developed by the company is set...
M.E Energy secures order for 3 nos coke oven by-product line
M.E Energy, secure the order for 3 nos coke oven by-product line for a steel major in West India. This is one of the many coke oven by-product lines already designed, manufactured and supplied by M.E Energy across the steel industry.
M.E Energy received a prestigious order for supply of skids and posts for two re-heating furnaces
M.E Energy received a prestigious order for supply of skids and posts for Two Re-heating Furnaces being installed in an integrated steel plant in western India. These skids and posts will protect furnace parts by maintaining lower temperatures.