CASH SAVINGS FROM WASTE HEAT RECOVERY ON SINTER PLANT

 

Introduction :

Modern steel plants generate huge profits from energy savings and sale of by-products or rather, the profitability of steel plants hinges upon energy recovery and sale of by-products today. Huge opportunities exist in recovering waste heat from almost all processes in an integrated steel mill–Coke Oven, Blast Furnace, Electric Arc Furnace, Basic Oxygen Furnace and of course, the Sinter Plant. M. E. Energy, a Pune based engineering company, focusing on Energy & Energy Saving Projects, have executed similar projects for waste heat recovery from various equipment in Steel plants. The most recent one is probably the largest Waste Heat Recovery Boiler (WHRB) in India for Sinter Plant till date and that too with an innovative dual heat recovery system installed by M.E Energy.

Sinter Plant Waste Heat Recovery System :

Iron ore fines along with flux and coke fines or coal are heated to produce a semi-molten mass that solidifies into porous pieces of sinter with the size and strength characteristics necessary for feeding into the blast furnace. The sinter so produced is crushed and discharged into a sinter cooler, where

appnot1


it is cooled by using a forced draught fan. The ambient air gets heated up to approximately 400°C in this process. The mass flow rate of this cooling air being extremely large, the amount of heat energy that can be recovered and reutilized is enormous! The hot air emerging out from the cooler has very high dust concentration, up to 4,000 mg/Nm3, and the WHRB is well designed to take care of the fouling and environmental concerns. Two Stage Heat Recovery System:
The Hot exhaust gases from the Sinter Cooler first enter a mechanical dust collection device and then a well-designed WHRB to generate Superheated or Saturated steam, as per the plant

appnote2

requirement. Even after the WHRB recovering maximum heat feasible technically, the existing gases have large appnote3 amount of low grade heat. This heat is recovered by a Hot Water Heat Recovery Unit (HWHRU) downstream the WHRB, as hot water circulating in a closed loop system. The steam thus generated could be put to use in the plant and the Hot water is used as energy source for Vapour Absorption Chiller. The system is well-equipped with necessary instrumentation and a PLC based system for safety & controls, monitoring and diagnostics. Downstream of these systems, an Electro Static Precipitator is provided prior to gases exiting through Chimney.

 

Typical System Parameters of a WHR System:

 

Sr. No Description Values
1. Sinter Plant size 450 m2
2. Gas flow rate / Inlet temperature 450,000 Nm3/hr, 400°C
3. Superheated Steam from WHRB 40 TPH, 24 bar (a), 310°C
4. Hot water for Chiller 10 Million kCal/hr
5. Chiller Output 2400 TR
6. Gas exit Temperature 130°C
7. Approximate cash savings $ 4.2 Million
8. Payback period Less than 1 year

 

Major Benefits:

  • Cash savings from Energy Savings – Free Steam and Chiller capacity.
  • Lower cost of ESP & Downstream system due to lower dust concentration in gases.

Our Offerings

Corporate Office

Gat No.1083/1B, Markal
Tal- Khed, Dist-Pune 412105
Maharashtra, India.
Tel  : +91 2135 62 62 62
Fax : +91 2135 62 62 98
This email address is being protected from spambots. You need JavaScript enabled to view it.

Follow Us

2012 M.E. Enegry Pvt. Ltd. All Rights Reserved.

Disclaimer
The Logos, Tradenames, Trademarks etc used in this site are properties of respective owners.

Developed by Intreractive Solutions